nhester8463 nhester8463 24-10-2022 Engineering contestada a 30-station transfer line has an ideal cycle time of 0.75 min, an average downtime of 6.0 min per line stop occurrence, and a station failure frequency of 0.01 for all stations. determine the current line efficiency and produc