A bicycle manufacturer requires tires. During the entire lead time for tires, inventory consumption is normally distributed with a mean of 1200 tires and a standard deviation of 300 tires. If the manufacturer wishes to avoid a stockout with probability
P(z<+3.00)=.9987
, what should the reorder point be? A. 2100 B. 2150 C. 2000 D. 2200 E. 2050