which of the following statements is true with regard to the departmental overhead rate method? multiple choice it uses a different overhead rate for each department. it is the same as activity-based costing. each department has the same rate for the same activity pool. it is especially accurate in assigning overhead costs that are not driven by production volume. it requires one overhead cost pool and one rate.