(30 points) The fixed costs of manufacturing basketballs in a factory are $1,400.00 per day. The variable costs are $5.25 per basketball. Which of the following
expressions can be used to model the cost of manufacturing b-basketballs in 1 day?
O $1,405.25b
o $5.25b-$1,400.00
O $1,400.00b+$5.25
O $1,400.00-$5.25b