b) The CEO has identified that (s)he would like to introduce Kanban to this area of the shop. The department uses 100 brazing wires per hour. A container holds a bundle of 10 brazing wires. It takes 20 minutes to receive the brazing wire from the warehouse. A safety factor of 10% should be applied to calculations. How many Kanban containers of brazing wire are required for the brazing station? Do you think it is worth doing Kanban in this station?