sabrangel6445 sabrangel6445 22-01-2024 Engineering contestada Which item allows two AM–2 mat laying teams to start work in the middle of a runway and work in opposite directions towards the end of the runway?a. Typical key-lock.b. Starter key-lock.c. Towing tube.d. Starter tube.