phillip1211 phillip1211 22-02-2024 Business contestada During the month of April, direct labor cost totaled $14,960, and direct labor cost was 40% of prime cost. If total manufacturing costs during April were $78,800, the manufacturing overhead was:a) $23,040b) $63,840c) $19,920d) $59,840