Respuesta :
The basic costs curves that Seago Bricks will experience include:
- Marginal cost.
- Average fixed cost.
- Average variable cost.
- Average total cost.
What is a fixed cost?
Fixed costs simply means the indirect costs that aren't dependent on the level of production.
Also, the total cost simply means the addition of the variable cost and the fixed cost.
Learn more about cost on:
https://brainly.com/question/25109150