Answer:
predetermined manufacturing overhead rate $1.23
Explanation:
[tex]\frac{Cost\: Of \:Manufacturing \:Overhead}{Cost \:Driver}= Overhead \:Rate[/tex]
We will distribute the expected overhead cost along a cost driver.
In this case we are asked to use direct labor cost:
estimated overhead 270,300
estimated labor 219,800
overhead rate = 270,300 / 219,800 = 1,229754 = 1.23