Net Steels is a steel manufacturing company. It orders 180 metric tons of raw material per order. It was observed that the company often faces stockout. To tackle this issue, the company incorporated a fixed-quantity system (FQS) and collected the following data. Demand 11,000 metric tons per year Order Cost $18,000 per order Item Cost $36,000 per year Inventory-Holding Cost 20 percent per year Using the data, Net Steels determined that the economic order quantity (EOQ) should be 235 metric tons. In this scenario, the annual amount that Net Steels can save by ordering as per the EOQ instead of its conventional order is________.a. more than $45,000 but less than or equal to $55,000.b. more than $65,000.c. less than $45,000.d. more than $55,000 but less than or equal to $65,000.

Respuesta :

Answer:

c. less than $45,000

Explanation:

total cost with 180 metric tons of order

= $18000*11000 + 20%*36000*180/2 + 36000*11000/180

= $198000000 + $648000 + $2200000

= $200848000

total cost with 235 metric tons

= 18000*11000 + 7200*235/2 + 36000*11000/235

= 198000000 + 846000 + 1685106

= $200531106

net savings = $316894

Therefore, The annual amount that Net Steels can save by ordering as per the EOQ instead of its conventional order is less than $45,000.