A machine produces parts on an assembly line for an automotive manufacturer. If a part is defective, it must be scrapped. Every hour, the manager takes a random sample of 15 parts to test whether the process is "out of control" (i.e., to test whether the average proportion of defective parts exceeds 10%). Which of the following is a Type I error for this situation?