Respuesta :
Answer:
The third option is the best description.
Step-by-step explanation:
Shandra needs 40 minutes to complete to sand the table.
In 1 minute, Shandra completes [tex]\frac{1}{40}[/tex] part of the work.
Similarly, Kelly takes 1 hour, that is 60 minutes to complete to complete the work.
In 1 minute, Kelly completes [tex]\frac{1}{60}[/tex] part of the work.
In 1 minute, they together completes [tex]\frac{1}{40} + \frac{1}{60} = \frac{40 + 60}{40\times60} = \frac{100}{240} = \frac{5}{12}[/tex] part of the work.
Hence, [tex]\frac{5}{12}[/tex] part of the work takes 1 minute to complete.
The whole work will be completed in [tex]\frac{12}{5}[/tex] = 2 minute 24 seconds.
Shandra’s estimate is too high because it will take them about 2 minutes 24 seconds.
Answer: Shandra’s estimate is too high because it will take them about 24 minutes.
Step-by-step explanation: Edg 2020