Calculate the cost of Job 845 using a machine hour departmental overhead rate for the Milling Department ($32 per hour) and a direct hour overhead rate for the Finishing Department ($102 per hour). (Round your answer to the nearest dollar.)Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs:Setup (1,000 setup hours) $118,000Production scheduling (400 batches) 60,000Production engineering (60 change orders) 150,000Supervision (2,000 direct labor hours) 46,000Machine maintenance (12,000 machine hours) 60,000Total activity costs $434,000The following additional data were provided for Job 845:Direct materials costs $7,000Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000Setup hours 5 hoursProduction scheduling 1 batchMachine hours used (25 Milling machine hours;5 Finishing machine hours) 30 hoursProduction engineering 3 change orders

Respuesta :

Answer:

Total job cost= 12370$

Explanation:

Detailed solution is given in tabular form below:

Ver imagen hamzafarooqi188

Answer:

Job 845:

departamental overhead $ 4,370

Total cost  $ 12,370

activity base overhead  9310

Total cost: $ 17,310

Explanation:

Job 845

Materials 7000

Labort     1,000

Milling overherad:

25 machinie hours x $32 = $ 800

Finishing overhead

35 labor hours x $102 = $ 3,570

Total cost: $ 12,370

activity base overhead:

[tex]\left[\begin{array}{ccccc}Activity&Driver&cost&Total&Rate\\$Setup&setup&118000&1000&118\\$Scheduling&matches&60000&400&150\\$engineering&orders&150000&60&2500\\$supervision&DLH&46000&2000&23\\$maintenance&MH&60000&12000&5\\\end{array}\right][/tex]

Now we multiply by the rate:

[tex]\left[\begin{array}{ccccc}Activity&Rate&job 845&Allocate Rims\\$Setup&118&5&590\\$Scheduling&150&1&150\\$engineering&2500&3&7,500\\$supervision&23&40&920\\$maintenance&5&30&150\\$Total Overhead&&&9,310\\\end{array}\right][/tex]