Answer:
Option GPE is best when the contracted volume is below 100,000.
Option FMS is best when the contracted volume is between 100,000 and 300,000.
Option DM is best when the contracted volume is above 300,000.
Explanation:
Detailed step-wise solution is attached in the image below: