Answer:
At 1,000 units per day, ATC per unit is $0.45 per unit.
At 800 units per day, ATC per unit is $0.375 per unit.
At 500 units per day, ATC per unit is $0.55 per unit.
Explanation:
ATC is the average total cost. It refers to the total cost incurred, on average, in producing a single unit of production. It is calculated as follows.
ATC = Total Cost / Output
ATC per unit at the given levels of production is as follows.
When 1,000 units per day produced:
ATC = $450 / 1,000
= $0.45 per unit
When 800 units per day produced:
ATC = $300 / 800
= $0.375 per unit
When 500 units per day produced:
ATC = $275 / 500
= $0.55 per unit