Answer:
$15.34
Explanation:
The formula and the computation of the predetermined overhead rate is shown be
Predeterminer overhead rate = Manufacturing overhead ÷ direct labor hours
where,
Manufacturing overhead is
= $359,860 + $8,300
= $368,160
And, the direct labor hours is 24,000
So, the predetermined overhead rate is
= $368,160 ÷ 24,000
= $15.34