Draw the first level of preliminary WBS for building the small one story commercial building as shown below.
See image 1
Site preparation:
It involves the demolition or cureacking of buildings and other structures clearing of building sites and sale of materials from demolished strictures.
Mechanical System:
It is a system with moving parts. anything with moving parts can be considered as mechanical system.
Building Walls:
Wall is a structure that defines an area, carries load, provide shelter , sound proofing or is decorative.
Electrical system:
Electrical system are a group of electrical components connected to carry out some operation . often-the system are combined with other systems.
B) Draw the second level WBS system as shown below.
See image 2
Plumbing:
It is a system that provides fluid for a wide range of applications . plumbing uses pipes, valves, tanks and other apparatus to carry fluids.
Air heating System:
This can be made cost effective by combining with ventilation system.
Water Heating:
It is a heat transfer process that uses an energy source to heat water above its initial temperature.
Air conditioning:
Air conditioning is the process of removing heat and moisture from the interior of and occupied space to improve the comfort of residents.
Ventilation system:
It is intentional introduction of outside air into space and is mainly used to control indoor air quality by by diluting and displacing indoor pollutants.