A predetermined manufacturing overhead rate is calculated in the same manner as an actual manufacturing overhead rate except that estimated rather than actual costs and activity levels are used in computing predetermined overhead rates.
a) true
b) false

Respuesta :

Zviko

Answer:

a) true

Explanation:

The Formulae to compute the rates are :

Predetermined manufacturing overhead rate = Estimated Fixed Cost ÷ Estimated Activity

While,

Actual manufacturing overhead rate = Actual Fixed Cost ÷ Actual Activity