Answer: £188
Step-by-step explanation:
Given
The depth of the hole is 80 m
For the first meter, it is £30
After that, it is £2 per meter
after a meter, it is 79 m more
The total cost is C
[tex]\Rightarrow C=30+2\times 79\\\Rightarrow C=30+158=188[/tex]