During 2017, Waterway Industries expected Job No. 26 to cost $300000 of overhead, $500000 of materials, and $200000 in labor. Waterway applied overhead based on direct labor cost. Actual production required an overhead cost of $290000, $470000 in materials used, and $190000 in labor. All of the goods were completed. What amount was transferred to Finished Goods