Answer:
Annual Demand (D) = 25000
Carrying Cost (H) = 8
Ordering Costs (S) = 10
Number of working days = 300
Lead Time (Lt) = 3 days
a. EOQ = Sqrt (2*D*S/H)
EOQ = Sqrt (2*25000*10/8)
EOQ = Sqrt (62500)
EOQ = 250
b. Total Cost = (D * S) / EOQ + (EOQ * H) / 2
Total Cost = (25000 * 10) / 250 + (250 * 8) / 2
Total Cost = 1000 + 1000
Total Cost = 2000
Now, we calculate total Cost with order size: of 300
Total Cost = (25000 * 10) / 300 + (300 * 8) / 2
Total Costs = 833.3333 + 1200
Total Cost = 2,033.3333
The amount to lost if we order 300 units of wheat flour is as follows
= 2033.33 - 2000
= $33.33
3. ROP = (D / Number of working days) x Lt
ROP = (25000 / 300) * 3
ROP = 83.3333 * 3
ROP = 249.9999
ROP = 250