Respuesta :

Answer:

  A: 2 1/2 ft^2/h

  B: 3 1/3 ft^2/h

  B has the greater rate

Step-by-step explanation:

The rate in square feet per hour is found by dividing square feet by hours.

Machine A:

  (5/8 ft^2) ÷ (1/4 h) = (5/8)×(4/1) ft^2/h = 5/2 ft^2/h = 2 1/2 ft²/h

Machine B:

  (2/3 ft^2) ÷ (1/5 h) = (2/3)×(5/1) ft^2/h = 10/3 ft²/h = 3 1/3 ft²/h

Machine B has the greater rate.