Using a system of equations, it is found that the usual waiting time for the bumper cars is of 7.5 min.
A system of equations is when two or more variables are related, and equations are built to find the values of each variable.
In this problem, the variables are:
The waiting time for the roller coaster is usually 3 times as long as the waiting time for the bumper cars, hence:
x = 3y
The park's website says that visitors who go on both rides should expect to wait a total of 30 min, hence:
x + y = 30
Since x = 3y:
3y + y = 30
4y = 30
y = 30/4
y = 7.5.
The usual waiting time for the bumper cars is of 7.5 min.
More can be learned about a system of equations at https://brainly.com/question/24342899