Structural Safety Assessment and Traffic Control Strategies of Widened Highway Bridges under Maintenance Works Requiring Partial Lane Closure

Respuesta :

Structural Safety Assessment and Traffic Control Strategies of Widened Highway Bridges under Maintenance Works Requiring Partial Lane Closure journal is based on the  way and techniques that can be used in maintaining  the Safety on the road as well as the Assessment of Traffic Control.

What are the techniques in controlling the traffic?

There are Devices that are typically used in the traffic control, and this can  include speed bumps as well as the barricades to block streets.

Others techniques are:

  • turn prohibitions
  • stop signs
  • raised pavement markers.

Traffic restraint can also entails the includes programs  that can foster bicycle as well as the pedestrian travel.

The rapid structural safety assessment help in inspecting and evaluating the concrete structure as well in determining  the damaged structure if it is  unsafe for personnel within the building .

Learn more about Traffic Control at:

https://brainly.com/question/26052026

#SPJ1