Respuesta :
Company A:
Assembling: 3200 mins /32 mins per toy=100 toys
Packaging: 960 mins / 8 mins per toy= 120 toys
Company B:
Assembling: 3200 mins / 20 mins per toy= 160 toys
Packaging: 960 mins / 10 mins per toy= 96 toys
Assembling: 3200 mins /32 mins per toy=100 toys
Packaging: 960 mins / 8 mins per toy= 120 toys
Company B:
Assembling: 3200 mins / 20 mins per toy= 160 toys
Packaging: 960 mins / 10 mins per toy= 96 toys
Answer:
A=80units for model A
B=32units for model B
Step-by-step explanation:
We take A as the quantity produced for model A and B as the quantity for model B.
the total available time for assembling is
3200
the total available time for packaging is
960
Therefore 32A+20B≤3200
8A+10B≤960
we will arrive at maximum production when all the units are used up
32A+20B=3200 assembling time
8A+10B=960 packaging minutes
solving the sumultaneius equation using substitution method
from equation 1
B=(3200-32A)/20
B=160-1.6A
substitute B into equation 2
8A+10(160-1.6A)=960
8A=640
A=80
from equation 2
8A+10B=960
8(80)+10B=960
B=32