Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications). Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers:
Explanation:
All of the given options are unit-level activities. So, option (d) is the correct answer.
What are unit-level activities?
Activities at the unit level are carried out in order to make the product. There are four steps in this manufacturing process:
1. engineering
2. setups
3. machining
4. inspecting
Unit-level activities are dependent on the number of units generated, which means that when the number of units produced increases, more expenditures are allocated.
Engineering, setups, and inspections are all done in batches in this situation, hence they are batch-level operations.