Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications). Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Engineering $1,000,000 Setups 900,000 Machining 2,000,000 Inspection 800,000 Providing space 250,000 Providing utilities 180,000 Activity drivers for each activity have been identified and their practical capacities listed: Machine hours 25,000 Setups 200 Engineering hours 5,000 Inspection hours 2,500 The costs of facility-level activities are assigned using machine hours. What is (are) the product-level activity(ies)? a.engineering b.inspecting c.setups d.All of these choices are correct.

Respuesta :

Answer:

Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications). Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers:

Explanation:

All of the given options are unit-level activities. So, option (d) is the correct answer.

What are unit-level activities?

Activities at the unit level are carried out in order to make the product. There are four steps in this manufacturing process:

1. engineering

2. setups

3. machining

4. inspecting

Unit-level activities are dependent on the number of units generated, which means that when the number of units produced increases, more expenditures are allocated.

Engineering, setups, and inspections are all done in batches in this situation, hence they are batch-level operations.

For more information about unit-level activities, refer below

https://brainly.com/question/15047575