Answer:
Predetermined manufacturing overhead rate= $35.65 per machine hour
Explanation:
Giving the following information:
Estimated the machine-hours= 45,900
The estimated variable manufacturing overhead was $7.53 per machine-hour.
The estimated total fixed manufacturing overhead was $1,290,708.
To calculate the predetermined overhead rate, we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= (1,290,708/45,900) + 7.53
Predetermined manufacturing overhead rate= $35.65 per machine hour