Answer:
1. Utilization rate = Operating time/Scheduled time
Utilization rate = 5,696/6,400
Utilization rate = 0.89
2. Efficiency rate = (Total output / Ideal run rate) / Operating time
Efficiency rate = (18,100/2) / 5,696
Efficiency rate = 9,050 / 5,696
Efficiency rate = 1.5888343
Efficiency rate = 1.59
3. Quality rate = Good units produced / Total units produced
Quality rate = 12,670 / 18,100
Quality rate = 0.70
4. Overall Equipment Effectiveness = Utilization rate * Efficiency rate * Quality rate
Overall Equipment Effectiveness = 0.89 * 1.59 * 0.70
Overall Equipment Effectiveness = 0.99057
Overall Equipment Effectiveness = 0.991
The utilization rate is 0.89 and the efficiency rate is 1.59.
From the information given, the utilization rate will be:
= Operating time/Scheduled time
= 5,696/6,400
= 0.89
The efficiency rate will be:
= (Total output / Ideal run rate) / Operating time
= (18,100/2) / 5,696
= 9,050 / 5,696
= 1.59
The quality rate will be:
= Good units produced / Total unit
= 12,670 / 18,100
= 0.70
The overall equipment effectiveness will be:
= Utilization rate × Efficiency rate × Quality rate
= 0.89 × 1.59 × 0.70
= 0.991